Substation Installation and Commissioning Services

Renewable Energy Systems - Electrical, Protection and Control at various Windfarm sites in the UK

wadlow wind farm panel

Idec Power Systems are responsible for the installation and commissioning of all the Electrical and Control Equipment as follows:

  • Installation of 33kV protection panels for the Fulbourne / Linton and Burwell / Linton 33kV connections
  • Installation of 33kV control panels for the Fulbourne / Linton and Burwell / Linton 33kV Connections
  • Installation of 110V DC battery / charger units (one per grid connection)
  • Installation of ESS panel
  • Installation of HMI within control panels
  • Installation and termination of multicore and multipair cables, these will be PVCPVCSWAPVC.
  • Installation of all above ground earthing connections
  • Supervision of offloading and installation of two off Pre Insertion resistors onto precast foundations
  • Supervision of offloading and installation of two off Auxiliary Transformers onto precast foundations / s
  • Installation of four off emergency stop push buttons
  • Installation of cast resin slipover CTs and support structures for the pre-insertion resistor protection systems
  • Installaton of castell key interlocks
  • The installation of 'RISE' duct sealing systems (gas and water) to the ducts for the multicore cabling within the control room

The commissioning of the system engineer carrying out all primary and secondary injection testing, DC function testing etc in order to prove the equipment ready for service.

 